triox informatika

Services

Audit Restore Validation and Restore Testing

Documented restore tests that prove your backups can actually be used in a critical situation.

A backup is not proof. A restore is.

More and more audits, regulatory reviews and client requirements call for proof that backups are regularly restore-tested. We do the testing—and give you a written report on it.

The five steps of a restore test: selecting the backup point, setting up an isolated test environment, performing the restore, checking the data, and finally the audit-ready report. 01 Backup point from an agreed time 02 Test system isolated from live 03 Restore full or partial 04 Validation readability, integrity 05 Test report audit-ready

Why does restore testing matter?

A successful backup alone does not guarantee that the data can actually be restored after a system failure or a cyberattack. The real value of a backup system is proven not by the number of successful backups, but by a successful restore.

With our service, you:

  • meet audit and compliance requirements
  • prove that your backup process works
  • reduce business risk
  • uncover weaknesses in your backup system in time
  • receive documented evidence that the restore succeeded

Service packages

Package When is it recommended? Estimated time
Audit Restore Validation If the auditor only requires that data can be restored from the backups 4–6 engineer hours
Office infrastructure test To verify that Active Directory and the server infrastructure work fully 8–12 engineer hours
Third-party vendor system test To verify backups of a third-party vendor’s application and database 4–6 engineer hours
Microsoft 365 test To verify recovery of Exchange Online, SharePoint and OneDrive 6–10 engineer hours
Full Disaster Recovery test If a full infrastructure recovery drill is needed 24–40 engineer hours

1. Audit Restore Validation

Restore validation for audit purposes. It is the right choice if the auditor only requires proof that data can be successfully restored from the backups.

What the service includes

  • review of backup jobs
  • check of backup logs
  • selection of a restore point
  • sample-based restore
  • consistency check
  • data integrity check
  • preparation of an audit-ready report
  • removal of the test environment

Sample-based restore—typical objects: virtual server · file server directory · SQL database · Microsoft 365 mailbox · OneDrive · SharePoint data

Estimated time: 4–6 engineer hours


2. Office infrastructure restore test

Verification that Active Directory and the server infrastructure work fully.

Includes

  • Active Directory restore
  • file server restore
  • infrastructure servers
  • check of core services
  • functional tests
  • audit report

Estimated time: 8–12 engineer hours


3. Third-party vendor system restore test

Verification of the backups of a third-party vendor’s application and database.

Includes

  • application restore
  • database restore
  • verification that the service works
  • involving the third-party vendor if needed

Estimated time: 4–6 engineer hours

Note: The application vendor’s support fee is not part of our service.


4. Microsoft 365 restore test

Verification of recovery of the Microsoft 365 environment.

Includes

  • Exchange Online
  • SharePoint Online
  • OneDrive
  • other backed-up Microsoft 365 objects

Estimated time: 6–10 engineer hours


5. Full Disaster Recovery test

A comprehensive business continuity test for organizations that need a full infrastructure recovery drill.

Includes

  • full infrastructure restore
  • Active Directory
  • application servers
  • databases
  • Microsoft 365
  • proof of operation
  • detailed audit report

Estimated time: 24–40 engineer hours


How it works—the Audit Restore Validation process

1. Backup review

We review the backup jobs, check the successful backups and the backup logs, and then select the restore point.

2. Sample-based restore

We restore the objects agreed with the auditor or the designated owner to an isolated test environment—without touching the production system.

3. Consistency check

We check the restored system: whether the operating system boots, file system consistency, whether the services start, whether the application files are present, whether the database can be connected, and the event logs.

4. Data integrity check

We verify that the data is readable, the files are intact, the directory structure is correct and—where relevant—the permissions are in place.

5. Audit report

A detailed, audit-ready document is prepared. It includes the date of the test, the backup point used, the restored objects, the steps performed, the results of the checks, any errors, and recommendations for remediation.

Test rating: Passed · Passed with recommendations · Failed


What does the service not include?

Audit Restore Validation is not a full business continuity test. It does not include:

  • recovery of the full infrastructure
  • a full rebuild of Active Directory
  • full functional testing of business applications
  • user acceptance testing (UAT)
  • a full Business Continuity test
  • a full Disaster Recovery drill

If you need these, we recommend our Full Disaster Recovery test package.


Why Triox Informatika?

  • More than 20 years of enterprise IT operations experience
  • Operating Microsoft and virtualization infrastructures
  • Audit-ready documentation
  • Use of an isolated test environment
  • Experience in recovering critical systems
  • Fast and transparent service process

Request a quote

Every environment is unique, so before preparing the final quote, we first assess:

  • which systems the restore test covers
  • what backup technology is in use
  • what audit requirements must be met
  • what the deadline is

A restore test is not a cost—it is proof that, in a critical situation, your company’s data can actually be restored.

Request a quote